Karachaganak Expansion Project
The Karachaganak Expansion Project (KEP) is aimed at managing the increasing Gas/Oil Ratio of the Karachaganak reservoir fluid with time and capturing the value in the gas reserves through the optimisation and extension of the oil production plateau.
Gleeds remit was to undertake a Pre-FEED (Front End Engineering Design) estimate for the proposed new infrastructure.
Services :
Gestion des Coûts et Économie de la Construction
Valeur du Cycle de Vie et Analyse de la Valeur (Value Engineering)
Client :
URS
Localisation :
Kazakhstan
Date d'achèvement :
Dec 2014
Valeur :
Dave Corbin
Senior Director & Head of Client Accounts